This is Lochinvar’s second appearance on “This Old House.” Based on the size of the home and the specs of the project, Rich Trethewey and the Lochinvar team chose to install a fire-tube KNIGHT wall mount boiler with an input of 85,000 Btuh, as well as a 40-gallon Squire indirect water heater.
“We always enjoy working with Rich Trethewey and the This Old House crew,” said Stirling Boston, director of marketing for Lochinvar. “We’re thrilled that they came to us for assistance with the Cambridge Project and we can’t wait to see the KNIGHT and Squire in action on the final episode for this impressive renovation.”
To determine the air date and local listings in your area, go to www.thisoldhouse.com/tv, select the Cambridge House project, and under TV Schedule enter your zip code. The episode is #3215 named “The Big Finish.”
For more information on Lochinvar, visit www.lochinvar.com.
Publication date: 1/7/2013