Company: Cleaver-Brooks
Product: C2X-HE
Description: This product’s first-stage economizer, made of 304 stainless steel tubes with aluminized steel-fin material, returns wasted heat to the boiler feedwater. Its second-stage condensing section, constructed of 304 stainless steel tubes with aluminum-fin material, preheats make-up water or process water, delivering overall system efficiency. The economizer is ideal for applications with a 50-100 percent make-up water requirement. It is also ideal for process hot water applications such as food processing and industrial laundries. The heat exchanger in the C2X-HE is easily accessible; it is offset from the boiler on a dedicated stand, making it simple to service and clean.
Contact: 800-250-5883; www.cleaverbrooks.com;
eProduct 181
Publication date: 11/27/2017
Want more HVAC industry news and information? Join The NEWS on Facebook, Twitter, and LinkedIn today!