The outages occurred last year during periods of extreme heat and humidity when power and air conditioning loads were at their highest, as outlined in the final report of the U.S. Department of Energy Power Outage Study Team (POST) in March 2000.
Occhionero contends integrated systems should be in the recommendations by POST to enhance electric grid reliability, referring to the combination of the best electric and gas hvac for a particular building to increase efficiency, reduce operating cost, reduce overall emissions, provide greater reliability, and enhance comfort.