If a system was designed to operate in lead/lag, but lead/standby was implemented, it would not be able meet the flow requirements during the highest load periods.
If a system was designed to operate in lead/lag, but lead/standby was implemented, it would not be able meet the flow requirements during the highest load periods.
The earlier the commissioning professional can review design documents and provide feedback on compliance, the less potential rework the design team may need to do.
The earlier the commissioning professional can review design documents and provide feedback on compliance, the less potential rework the design team may need to do.
If system performance data reaches a dangerous level, condition-based monitoring alerts technicians to proactively correct the problem in time to prevent further damage.
If system performance data reaches a dangerous level, condition-based monitoring alerts technicians to proactively correct the problem in time to prevent further damage.
Grumman|Butkus Associates utilized a design-build retro-commissioning (DBRCx) approach to assist a large for-profit health care organization implement a nationwide retro-commissioning (RCx) program across multiple hospitals.
Grumman|Butkus Associates utilized a design-build retro-commissioning (DBRCx) approach to assist a large for-profit health care organization implement a nationwide retro-commissioning (RCx) program across multiple hospitals.