The project aimed to equip Procter & Gamble’s Shippensburg, Pennsylvania, warehouse with 28,000 feet of pipe using the Viega ProPress and Viega MegaPress mechanical pipe connection system.
The project aimed to insulate chilled and hot water piping in historic buildings without compromising architectural features in time for the start of the 2014-2015 school year.
Bardi Mechanical installs an intricate HVAC system to fulfill laboratory and biosafety requirements including HEPA filters and Greenheck laboratory exhaust fans for the Georgia Poultry Laboratory.
The goal of this project was to provide quality insulation for the rooftop ducts on Allan Hancock College’s new 44,788-square-foot student services and 21,053-square-foot administration building.
To meet the increasing demand on its data center applications, Vodacom required a solution that would allow it to quickly roll out additional facilities without the time, high cost, logistical barriers associated with new builds, or constraints of retrofitting facilities in existing buildings.
The project aimed to improve the infrastructure of five 10-story buildings at Westbrook Corporate Center in order to save energy and improve occupant comfort and satisfaction.
The goal of the project was to eliminate incidents of thermal retention occurring during summer months that could cause the air conditioning system to fail in the mission-critical facility.