Yee-Haw Brewing Company opened in a renovated train depot in Johnson City, Tennessee in the first half of 2015. Since then, the company has expanded distribution to Nashville and picked up a Bronze Award at the 2016 World Beer Cup, a global beer competition that recognizes the most outstanding brewers and beers.
The light load-bearing capacity of a 19th-century timber roof dictated an innovative HVAC retrofit for a historic downtown building renovation that's now home to the Detroit Institute of Music Education, a state-of-the-art music academy.
When Josh Jeffers put his vision of creating a mixed-use complex into motion with a multi-million-dollar overhaul, the goal for the Mackie Building was to maintain the historic design aesthetics while upgrading the HVAC system to effectively serve a diverse range of tenants.
JM Electrical Company Inc., an automated building system installation company, announced that it has completed project operations at Harvard Memorial Church, a historic development located at 1 Harvard Bus Tunnel in the center of Harvard Yard in Cambridge. JM partnered with a premier building technology company on this control system.
Historical buildings — from those on the local Main Street to world-renowned structures — could be brought from the past into an energy efficient future under a proposed guideline from ASHRAE.
In 2002, the board authorized the construction of a 25,000-square-foot county conservation learning center using a geothermal cooling and heating system. How did it turn out?