With 120,000 tons of firm capacity, 350 million-plus ton-hours per year of annual load, and a 2020 peak load of 78,600 ton, TECO’s power demand had grown enough to push the plant over the existing CHP’s capacity.
The partnership accelerates innovation by removing the complexities of bringing artificial intelligence (AI) to a diversity of devices at the edge, enabling smarter buildings that evolve and adapt through Johnson Controls OpenBlue technology.
While efficiency is sometimes thought of in terms of massive projects and initiatives, micro- improvements, like the choice of insulating material used on pipes, can have a significant impact on the bottom line.
For new residential and light commercial central air conditioning equipment, the AHRI petition seeks a regulation requiring that equipment manufacturers use refrigerants with a global warming potential (GWP) of 750 or less in equipment made after Jan. 1, 2025, with the exception of variable refrigerant flow (VRF) equipment, whose deadline would be Jan. 1, 2026.