A BAS spec is typically a section within Division 23 (e.g., 230923), while the sequences and points are usually provided elsewhere (i.e., on the drawings, in section 230993, or some combination thereof).
Last month, this column presented monitoring-based commissioning (MBCx) as a subset of ongoing commissioning of buildings that have previously been commissioned or retro-commissioned.
Total Energy Systems LLC of Green Bay, Wisconsin, a sales and service provider for Kohler generators, is expanding its territory into Eastern Michigan.
When Swire Coca-Cola needed to expand its Salt Lake City distribution center, its facility manager, environmental manager, and mechanical engineers reviewed heating and ventilating options and made an interesting decision.
One of the most challenging issues that a building systems engineer confronts is the need to create an environment that meets stringent temperature and humidity requirements in a location that’s not specifically designed for the task.
Built in 1983, One Logan Square is a 32-story office tower in Center City Philadelphia. The building was recently renovated, and the last remaining need was replacement of the original cooling tower.
Located close to various waterways, the University of North Carolina Wilmington (UNCW) takes marine science seriously. Its new MARBIONC Building — a 69,000-square-foot interdisciplinary research facility for marine biotechnology — provides labs for lease to commercial enterprises that require reliable, energy-efficient 24/7/365 cooling.