Calling all engineers, designers and other interested parties to enter the Green Leaf Inn Green Building Challenge. The Challenge asks for participants to design an Energy Management Control System; providing a strategy and product selection to control, manage and gather data on an integrated renewable energy system for the Green Leaf Inn (GLI), opening Spring 2013 as the first Net Zero Energy Hotel in North America. Interested parties must submit completed entry forms online by July 1 at www.thegreenleafinn.com.
An initiative that promises to make Milwaukee one of the most energy-efficient cities in the nation has been launched by the city and Milwaukee-based Johnson Controls.
When Ross Cailotto, the owner of R.E.C. Service Corp., heard about the KE2 Evaporator Efficiency controller (KE2 Evap), he knew he had found the solution. Before having the KE2 Evap, replacing an old Beacon system with mechanical controls meant moving product from the walk-in to temporary storage while the refrigeration system was off for 8 hrs or more.
With 10 LEED certified facilities and millions of additional square feet in the works, a well-known global Internet company committed to running green facilities was facing cooling and maintenance challenges at several of its data centers.
Appropriately enough, a good variable airflow design accommodates and refines a number of design variables. Particle monitoring strategies, minimum supply air calculation, HVAC sequencing, and space pressurization are just a few stops on the way to spotless performance.
Wood pellet boilers were a key innovative component of the recent $4.7 million upgrade at the Ketchikan Federal Building in Ketchikan, AK. The 1930s-era, six-story building had a 47-yr-old steam boiler system that was at the end of its useful life and was providing inconsistent heat to the building.
New ideas, regulations, and equipment are making some designs outdated faster than ever. How to take in an ever-evolving landscape, take a deep breath, and provide a data center design to stay proud of? Learn about an integrated VAV approach, the only control point that really matters, and more.
A learning environment adds extra meaning to the risks of “run to fail” mode, which can have the same effect on the budget as it does on the equipment. Covering everything from specification to installation and operation, schools need a permanent plan on hand for the moment when temporary HVAC becomes necessary.