A new PLC (programmable logic controller) simulator is designed to test new software programs while the physical units (chiller, pumping station, etc.) are being built, saving time on the test stand once manufacturing is complete, states the company.
The Klo-Shure® Insulation Coupling is a new way to install insulation on copper tubing used for refrigerant lines, hot- and cold-water plumbing, and chilled-water systems, the company states.
A four-head interchangeable screwdriver comes free with the purchase of the 27XT-P digital multimeter (DMM), through Oct. 30, 2002, or while supplies last.
The DRH122 thermo-hygrometer pen, designed for simplicity and one-handed operation, is a valuable preventive maintenance and quality assurance tool for checking temperature and relative humidity readings, states the company.
The Pinnacle™ gas-fired boiler has a state-of-the-art control board that modulates the boiler’s firing rate to match the actual heating needs of the building, says the company.