The Museum of the Bible’s project team was already up against the extremes of Washington weather and the high demands of IAQ for artifact preservation. A system that harnessed adequate cooling, heating, humidification, and ventilation capabilities would still have one more hurdle: a physical footprint of hardly Biblical proportion. Get a first look at this testament to design acumen and true collaboration.
A Mississippi clinic needed above-average design on a budget. The equipment was nothing unusual. However, creativity and attention to detail uncovered opportunities to fine-tune the design and exceed ventilation benchmarks for less.
Engineers’ daily challenges include calculations for outside air, supply air, and return or exhaust air flows — all while balancing mandated code requirements with owners’ expectations for performance, equipment first-cost, and future energy costs.