The retrofit project provides continuous building-by-building monitoring energy and utility cost analysis inventorying the chilled water flow meters and Btuh energy metering to determine decarbonization results.
The retrofit project provides continuous building-by-building monitoring energy and utility cost analysis inventorying the chilled water flow meters and Btuh energy metering to determine decarbonization results.
The new insulated hot water system shall replace the existing pipe distribution and shall include an in-line circulator and standby circulator, normally open ATC control valves to the radiant heat food warmers, DOAS heating, and existing dishwasher heating/booster coil.
As a result of the COVID-19 pandemic, a major convention center located in the southern part of the U.S. has put together an IPD team to update the policy and procedure (P&P) manual with “lessons-learned” over the past 18 months.