Systems documentation is critical, because each building’s systems are unique and designed by different engineers for different purposes in different climates in different architectural enclosures in different code jurisdictions.
Systems documentation is critical, because each building’s systems are unique and designed by different engineers for different purposes in different climates in different architectural enclosures in different code jurisdictions.
No matter how technically successful a project’s functional performance testing is, if the people responsible for maintaining proper operation of the new systems do not know what they need to do and why, system performance and efficiency will likely start to degrade immediately upon turnover.
No matter how technically successful a project’s functional performance testing is, if the people responsible for maintaining proper operation of the new systems do not know what they need to do and why, system performance and efficiency will likely start to degrade immediately upon turnover.
Commissioning professionals should be firm but fair with project teams when representing owners' interests, as the design and construction teams are ultimately responsible for achieving an owner's project requirements.
Commissioning professionals should be firm but fair with project teams when representing owners' interests, as the design and construction teams are ultimately responsible for achieving an owner's project requirements.
The punch list process can work well for static installation and documentation items but almost never includes dynamic or operational issues at the time of substantial completion.
Process commissioning is not commissioning, according to industry leaders who have worked hard for the past three decades to define and standardize a strong and meaningful process.
The organizations will work cooperatively to promote the advancement of emerging research and technologies to support a more sustainable built environment.