NRG will help the new Santa Clara Stadium become the first professional football stadium to open with Leadership in Energy and Environmental Design (LEED) certification and the first professional sports venue to achieve net zero energy performance in California during 49ers home games.
What factors prevent fans from not performing as specified? There are numerous reasons why fans may fail to perform as specified, but first it is important to understand what defines acceptable performance.
All major manufacturers of three-phase ac induction motors offer “inverter-duty” or “inverter-ready” models, but while these motors have inverter-rated insulation to protect the windings, the bearings — their most vulnerable parts — are too often ignored.
Are some of your best marketing and selling tools on the shelf collecting dust? Is this the right time for you to go back and use the selling tools that made you money years ago? Tools like personally contacting your customers. In person.
For over half a century, Slant/Fin has called Long Island home. As with virtually everyone else in the New York metro area and New Jersey, everyone employed there was in some way affected by Hurricane Sandy. Some suffered damage to their homes and cars, and almost all were without power at home for a week or more.
Bob and Tim arrived at their fifth service call of the day. They were both wet from servicing a heat pump outdoor unit in the snow. This was a no heat call for a gas furnace. The weather was cold and there was no heat at all in the house.
Leading green building and sustainability consultant Jerry Yudelson has released his annual list of “Top 10 Megatrends” for the green building industry. Yudelson said, “It looks like a good year ahead for the green building industry.”
Lawsuits are expensive and inconvenient, but employee litigation can be even more painful for companies, executives, and managers. Fortunately, employers can minimize many employee lawsuits and their fallout through arbitration agreements, where a neutral arbitrator hears the facts of the dispute and makes a binding ruling.
Tecogen Inc. announced that it has signed a contract with the Brevoort East, a luxury 323 unit high-rise co-op in Greenwich Village, N.Y., to provide a turnkey Tecogen combined cooling, heating, and power (CCHP) system. The system will deliver electricity, space heating, domestic hot water, and air conditioning to the building’s common areas.
In this troubleshooting problem, the customer’s general definition of the situation gets more specific when you arrive at the site and discover that the reason there is no heat is because although the burners ignite on a call for heat, the air handling system never starts, and the system’s limit control shuts the furnace down.