The final construction numbers for 2012 aren’t all tabulated yet, but the Associated Builders and Contractors Inc. (ABC) is making predictions about what some sectors of the construction market will look like in 2013. Nonresidential construction is predicted to expand by 5.2 percent next year.
Educational sessions at the 35th World Energy Engineering Congress, held Oct. 31 to Nov. 2 at the Georgia World Congress Center in Atlanta, covered a broad range of energy-related topics. Two of particular interest to the HVAC industry included energy management and building commissioning.
Featuring a cooling capacity of 16,800 Btuh, the portable air conditioning unit added to the company’s lineup can operate between 64 and 104°F. The unit comes standard with cold air nozzles or a grille option, and has optional accessories that include a condensate pump, condenser air plenum, and remote control.
The TriMax Control helps the Esteem 399 wall-hung condensing boilers deliver 96 percent efficiency for improved system operation and reduce energy consumption in a variety of commercial applications requiring 16,000-399,000 Btuh. The control’s 60-second setup simplifies boiler installation.
Not even a devastating earthquake and tsunami could keep two of the world’s leading HVACR companies from completing an acquisition this November. That is why The NEWS has chosen Takeshi Ebisu of Daikin Industries Ltd. and Dave Swift of Goodman Global Group Inc. as 2012 NEWSmakers.
Contractors from around the country converged on Planet Hollywood in Las Vegas for the Nexstar Network’s Super Meeting. The meeting was titled “Customers First” and included informative sessions and plenty of networking opportunities.
Is America approaching a fiscal cliff? That depends on who you talk to. Find out what Alan Beaulieu and other keynote speakers had to say at the 2012 HARDI Annual Conference.
The Redi-Purge noncondensable gravity flow purge 007 Series units are a virtual drop-in replacement for purge units that pull from and return to the condenser. The series includes models 007-11-C3 and 007-123-C3. According to the manufacturer, the refrigerant charge does not have to be pulled to install.
Reducing the need for costly demolition or helicopter expenses, the Rapid Knock-Down (RKD) air handler is designed to be delivered to the jobsite in sections matched to the building’s minimum opening, to allow for easier installation into tight or hard-to-reach spaces.
Two recent projects demonstrated successful retrofitting of HFC refrigerants into existing HCFC-22 systems. These projects, which were highlighted by Arkema, detail the processes with regard to HFC-427A in refrigeration and air conditioning applications.