This Rhode Island center of higher learning challenged an initial
benchmark and forged a vision of better energy management through an
upgraded campus-wide BAS. A design-bid approach, a five-point
scorecard for grading bids, and a full-time monitor for the new setup
were just three example of how process can drive performance in
educational and commercial settings alike.
Maybe
the problem was born in design - overestimating pump head, or a
cooling tower that isn’t towering enough. Or it arose in
installation - say, misconnected coils. Even then, a fix may create
a new water mystery. Get in step with some successful detecting
habits to correct the next troubled system you see.