This month’s Facility File is based on a new 40,000-square-foot office building HVAC system using VRF heat pump equipment with a focus on the Back2Basics February test. The project will include two VRF systems, each serving approximately 20,000 square feet of space. The building will also have a 100 percent DOAS gas-fired rooftop HVAC system for ventilation to the occupants in the building.
This month's Facility Files will focus on the Back2Basics test addressing the renovation of an existing Metro station with the addition of a new smoke evacuation system located within the building and within the subway’s inbound and outbound tunnels. The associated ADA-compliant elevator will have its own stand-alone, engineered, smoke control, 100 percent outside air fan to a positive-pressurized elevator shaft system.
This month’s Facility File will focus on the B2B December test for the energy retrofit of a commercial office building hot water heating system conversion from a utility company steam system to a new, high-efficiency condensing boiler system.
This month’s Facility File will focus on the B2B November test for the addition of a 100-ton, year-round cooling tower addition as standby to an existing, older cooling tower serving a process cooling system in a pharmaceutical facility.
This month’s B2B will focus on an 800,000-square-foot existing in-patient health care facility committed to recommissioning its boiler room operation and maintenance management to maintain a highly performing, safe boiler plant environment.
This month’s B2B will focus on an existing two-story commercial office building receiving an energy grant to retrofit the existing air-cooled 160-ton chillers to an 80-ton, thermal energy storage (TES) system with new variable flow chilled water equipment.
This month’s Facility File will focus on a new central, high-efficient, hot water boiler plant to replace an antiquated remote high-pressure steam boiler plant serving a campus setting.
This month’s Facility File is based on a 1,000-kW cogeneration unit with hot water energy recovery to an existing health care campus process heating system and the domestic hot water heating system that serves this health care campus.
This month’s B2B will focus on a college building program to add dormitory building smoke exhaust systems to serve existing corridors in three four-story buildings.
This month’s Facility File will focus on an industrial facility capital project to furnish and install an emergency generator within its own generator room.