This month’s Facility File will focus on the B2B March test for the retrofit of a 1960s, 250,000-sq-ft hospital conversion to apartments changing out the high-pressure steam boilers to hot water boiler modules.
This month’s Facility File will focus on the B2B March test for the retrofit of a 1960s, 250,000-sq-ft hospital conversion to apartments changing out the high-pressure steam boilers to hot water boiler modules.
This month’s B2B will focus on a new 12-story patient tower located at a health care campus. This month’s test will address the design intent of an engineered zoned smoke control of return air, supply air, and exhaust air system serving the patient floor common corridors.
This month’s B2B will focus on the renovation of the office space (not part of B2B test) and replacement of the building’s existing baseboard radiation to new overhead radiant heat panels to be installed in the ceiling around the perimeter of the single-story 40,000-sq-ft building.
This month’s Facility File will focus on the B2B November test for HVAC applications to replace an existing cooling tower at a pharmaceutical facility.
This month’s Facility File is based on a project renovation of an 80,000-sq-ft existing commercial office building being renovated to an outpatient health care facility.
This month’s B2B will focus on the B2B July test for HVAC applications of an existing emergency space renovation and is based on chapter 8 (Health Care Facilities) in the 2015 ASHRAE Handbook — HVAC Applications, It is focused on the temporary HEPA filter systems installed within the construction space to maintain a negative pressure in this space.
This month’s Facility File will focus on the B2B June test for a heating application on a college campus, with a building program removing a dormitory heating system from the campus high-pressure steam system and replacing it with a high-efficiency condensing hot water boiler within the dormitory.