B&W PGG will redesign and supply superheater and reheater surface, low NOx combustion systems, pulverizer performance enhancements, and other boiler upgrade equipment.
Suralaya's Units 1 and 2, currently 400 MW each, were originally supplied by B&W in the early 1980s. The upgrades will increase the capacity of each unit to 440 MW.