"We are seeing more engineers and owners wanting field verification of leakage and deflection to prove the unit meets the manufactures leakage and deflection rates," said Jeff Keene.
The typical evolution of an HVAC system’s sequence of operation (SOO) entails the design engineer writing the narrative for inclusion in the design documents.
OTTO offers a platform and services for commissioning, energy management, and controls professionals to access building analytics for new construction and existing projects.
Using chilled-water cooling coils within makeup air units (MAUs) as dry coolers offers enhanced operational stability even in lower ambient temperatures. Explore real-world case studies, where smart sequence modifications optimized performance.
Treading lightly with your involvement in troubleshooting in new construction commissioning is necessary to avoid busting your budget or having others shift their responsibility onto you.
Ideally, recommendations for addressing complex issues will prompt healthy collaboration between team members who all keep an open mind and remain committed to doing the right thing for the building.