Understanding how to select, specify, and install electric boilers for the specific situation will conserve substantial energy, space, and resources compared to fuel-fired options.
I don’t know who coined the phrase, “High-Performance Building” (HPB) but, whoever that individual was, he or she probably would be surprised how these three words are used to define several categories today.
As data centers deploy new computing infrastructure to meet the needs of AI, the industry is awakening to the realization that the current grid may not be equipped to support growing requirements.
As market demand for computing power increases (partly fueled by the virality of generative artificial intelligence), engineers are required to rethink data center design.
Building enclosures rely on heat and moisture control to avoid significant energy loss due to airflow leakage, which makes buildings less comfortable and more costly to maintain. This problem will likely be compounded by climate change.
The shift to electric PRVs is a result ofthe overall trend of digitally connecting all components to building automation systems for greater visibility and control and for lower energy consumption.
Beyond their premiere 162,000-square-foot flagship data center in Staten Island, Telehouse America also offers colocation at their second New York City site in Manhattan as well as another site in Los Angeles, California.