A lot has happened since the author’s 2008
article. It’s prime time to revisit expectations for BAS and chiller
optimization controls, and then have a look at several of today’s options for
anyone managing chilled water flow to wring the last drop of efficiency out of
a system.
Innovation has thrived in Philadelphia since Ben Franklin invented bifocals, the lightning rod, and the wood stove that bears his name more than two centuries ago. This tradition of innovation
Using a CO2 cooling system reduced this organic grocery store’s refrigerant use by 60% to 65% a year. Arizona-based Sprouts Farmers Market is not only a leader in natural and
Regulatory, competitive, and environmental
pressures are pushing data centers away from the traditional power sources.
Here, the author surveys the landscape and reviews one comparative study
involving CCP cogeneration and conventional electricity sources. Reducing the
carbon footprint and lessening reliance on a sometimes unreliable grid are just
two reasons to look into CCP.
Two energy recovery units saved this Air Force Base hangar $24,500 in heat recovery costs. United States Air Force personnel sought a solution to renovate the makeup air and exhaust
Forget high-tech or
high-expense fixes for a minute. Have you tried to bump efficiency by looking
for the next aisle over, deploying a
Trim and Respond strategy, or trying the soon-to-be-famous Paper On A Stick approach?
Some of the biggest names in the data center universe think that you plant the
seeds of real savings with some mighty simple steps.
The author describes how toilet flushes
aerosolize germs sending them airborne to soar around and infect their next
victim(s) because bathrooms are designed backwards. Learn novel ways to control
and clean bathroom air to help control airborne disease transmission problems.
So feel free to hold your nose as you learn about how you can help protect
people’s health within your client’s buildings.
Here, our long-time forward-thinking columnist uses a common hospital scenario to walk you through the shift from Design-Bid-Build to an Integrated Project Delivery approach. See how the job can get done with similar personnel on a considerably shorter schedule, resulting in a greater team investment in the project’s success and yet more time to get on to other work.