Life is filled with unintended consequences and sometimes so are boiler rooms. When you’re tasked with designing and/or installing a replacement boiler for a customer, you’re certainly performing your due diligence, but there may still be problems that you do not anticipate.
A Missouri college called late last fall with a problem. Its heating system, a central campus heating water boiler plant with two pumped loops and three distribution branches, had developed a leak in the loop to the library building across the quad.
This month’s Facility File will focus on the B2B June test for the renovation of an office building located on a major corporation’s U.S. headquarters campus. The existing HVAC system to be replaced is an antiquated hot water heating system serving baseboard radiation, unit heaters, and a rooftop HVAC unit.
When Major League Soccer club the Real Salt Lake Monarchs embarked on building the largest pre-engineered, free-span facility in North America, a critical concern was efficiently heating the space during the cold Utah winter months.
Mount Royal University (MRU) in Calgary, Alberta, Canada, has a full-time student population of more than 10,000. Founded in 1910, the university moved to its current 118-acre suburban campus in 1970.
In April of 2011, the University of Utah broke ground on a renovation to consolidate multiple production centers into a central multi-tier data center in support of their diverse program mix, which includes the university’s Center for High-Performance Computing (CHPC).