As a luxury resort, comfort is a top priority for Pacific Palms Resort. However, the resort, situated on the outskirts of Los Angeles, was in need of an energy-efficient and sustainable HVAC solution.
Consider these factors when sizing up a potential upgrade. In addition, pick up a few easy tips for maintenance in the meantime. You can’t necessarily buy time, but you can get in front of a worst-case breakdown scenario.
According to the ASHRAE systems handbook, HVACR machines will last 15 to 18 years, provided that a median level of preventive care is performed throughout its life cycle.
Sometimes it does pay to sweat the small stuff. Data availability might vary depending simply on where you’re accessing it. Not only selection but placement of your sensors and transmitters can influence their effectiveness and response time. Bearing down on such details on the BMS side can yield long-term results for your cooling goals.
Properly selected automated controls to minimize chiller plant energy, power consumption, and the cost of operations are essential for overarching chiller plant performance.
Clarify the difference between pressure dependent and pressure independent systems, and then make a deep dive into this TAB process. There’s a lot of science involved, but in the end, steering and tweaking the process may seem more like an art.
In which the author explores the specific strengths and attributes of various boiler types, along with pumping options and other system factors. The goal: To help you intelligently align your project’s equipment choices with its particular load, meeting expectations while avoiding Delta T headaches.
Engineers face multiple options for providing hydronic heat, along with additional decisions regarding whether that design should also serve other components such as domestic hot water.