During construction of the 190-unit, 15-story JeffJack Apartments building in downtown Chicago, the owner sought an effective method to prevent snow and ice build-up on the building’s parking garage ramps during winter.
When the school year kicks off each year in late summer, it’s not unusual for temperatures in many parts of the country to soar into the 90s, which can make it difficult for students to concentrate and be productive.
This month’s Facility File will focus on the B2B April test for an HVAC application within a high school facility, with the existing field house HVAC system being retrofitted to serve as an emergency shelter building with its associated locker rooms and toilet facilities.
There is universal agreement that homo sapiens, or humans, are at the top of the food chain because of our big brains. The downside is big brains are big drains.