A Giant Eagle distributor in Cleveland needed to replace inefficient unit heaters that were used to heat its 61-dock door, 540,700-sq-ft distribution facility.
As a luxury resort, comfort is a top priority for Pacific Palms Resort. However, the resort, situated on the outskirts of Los Angeles, was in need of an energy-efficient and sustainable HVAC solution.
This past August, I wrote in this column about the opportunity to invest in a niche business providing temporary HVAC design and construction administration.
Mold concerns became highlighted in the 1920s, when commercial and military needs for safe storage and transport of supplies focused attention on preventing biological deterioration of materials.
Most people in the major design and construction business understand that commissioning is a process by which a building’s systems are verified to function properly prior to acceptance by the owner.
Consider these factors when sizing up a potential upgrade. In addition, pick up a few easy tips for maintenance in the meantime. You can’t necessarily buy time, but you can get in front of a worst-case breakdown scenario.
According to the ASHRAE systems handbook, HVACR machines will last 15 to 18 years, provided that a median level of preventive care is performed throughout its life cycle.