When Geary Community Hospital (Junction City, KS) underwent a $34 million expansion, it was promised a cutting-edge HVAC design that would reduce maintenance costs, increase energy efficiency, and provide unprecedented IAQ.
The retrofit of a 25-yr-old conventional indoor city recreation center proved to be a psychometrics and logistics challenge, according to the project’s engineer and mechanical contractor.
The Mi-T-M Corp., an industrial power equipment manufacturer, is savings tens of thousands of dollars annually thanks to one contractor’s industrial ventilation design.
Quietside recently expanded its Forth Worth-based training center, and the distributor hopes that individuals attending classes will learn as much about installation aesthetics as they will about Samsung’s variable refrigerant flow systems.
MONTH 3- The Energy Conservation Opportunity: Process Heating for an Industrial Building Application - Solution Implementation and Monitor, Measure, and Benchmarking
Putting a new boiler in is a lot more complicated than just putting a new boiler in. You’re often taking ownership for any problem, real or potential, anywhere in the hydronics system.
Designing a commercial boiler replacement where you were not the original designer or installer might have some hidden dangers that could haunt you for years.