“Insulation systems appear to be simple, but doing them correctly can be complex,” says John Puskar, president of Prescient Technical Services and an expert on codes and standards related to piping, furnaces, and boilers.
After selecting or investing in high-efficiency equipment, the last thing you want to do is give that savings away. Careful attention to sizing and piping can keep your system configured for success.
Owners, engineers, and contractors are increasingly understanding the advantages of designing new hydronic heating plants using high-efficiency condensing boilers.
Complex space/pressure relationships, grease management issues, and outside consultants represent just part of the recipe that the mechanical engineer must master.
Commercial kitchen ventilation (CKV) has been a challenge to mechanical engineers for years. Part of the challenge comes from the fact that the mechanical engineer is normally not the “kitchen consultant.
You may be underestimating how many energy-saving steps you can take right now for that data center, no approvals required. And why are so many people still in there, anyway?
After 20 years in data centers, you might think I hang out on the bleeding edge with liquid-cooled chips, servers immersed in mineral oil, and computers singing “Daisy Bell” in three-part harmony.
In May 2017, this column addressed additions to existing BAS. It recommended that most building owners should sole-source these projects using the base-building’s BAS manufacturer.
This month’s B2B will focus on a new 12-story patient tower located at a health care campus. This month’s test will address the design intent of an engineered zoned smoke control of return air, supply air, and exhaust air system serving the patient floor common corridors.
In the commissioning specification, the owner made the general contractor responsible for the cost of retesting required due to deficiencies discovered during initial functional performance testing.