This month’s B2B will focus on an existing datacom room located within a 200,000-sq-ft financial business office building. The existing datacom room is being expanded from 10,000 sq ft to 20,000 sq ft.
The increased focus on efficiency within the data cente world brings higher demands for thoughtful, well-planned spaces to house current IT equipment with consideration given to future needs.
Look at not only some nearly automatic benefits-in-waiting for your average hospital boiler retrofit, but also at some ideas for what to do if there isn’t budget for a full replacement. Meanwhile, a short laundry list of hospital-specific boiler considerations actually includes the laundry (but not how you might expect).
Late last year (November and December, 2015) this column addressed the situation where a third-party commissioning professional is not by with the building owner until the last few weeks of construction.
We almost always think about the BAS as a tool that is a critical part of energy management, so these systems are typically focused on those systems that directly use energy — notably the HVAC and lighting systems.
The winter months are here! For those of us who live or work in in a cold climate, some form of heat is on, the windows are closed, and we may be sneezing and wheezing.
In last November’s Back2Basics, I created a test for the readers based on the idea that the patient room design was similar to a pharmaceutical cleanroom, with an air lock for people to enter and leave the room.
It’s not surprising that a brewery named for a river located in the untrammeled wilds of northern Maine would take its responsibilities to nature seriously.