When a community-based hospital adds a neonatal intensive care unit (NICU) so its most fragile patients can be cared for in-house rather than at a regional center 50 miles away, a family places enormous trust in the hospital’s ability to meet its baby’s health care needs.
Is there a standard default airflow rate for VAV fume hoods? The author works through the situation in pursuit of that answer and other effective alternatives.
In the ever-evolving world of building information modeling, putting process before technology solves fundamental issues. Read on as the authors touch on Agile, common roles, and BIM’s fate over the course of a project.
Pressure independent control valves proved to be a key in wringing the benefits out of smartly managed chilled water temperature, but that wasn’t all. Airside energy recovery, desiccant dehumidification to eliminate reheat in operating room environments, and upgrading to ECM fan systems have all contributed to this hospital’s fiscal wellness.
For a building program to be successful and sustainable, it must include an operating budget as well as a construction budget. Fifteen to 20% of the total cost of a building is first cost, and that remaining 80% or more is in the operation of the building over its life.
A pharmaceutical company looked to its new 350,000-sq-ft world headquarters as a place to further improve sustainability and reduce energy consumption.