The late Red Auerbach of the classic Boston Celtics teams earned a reputation for giving visiting teams less than a gracious welcome upon reaching the Garden for a game.
One of the worst things you can do is note the capacity and replace the chiller. Have the building loads and usage changed? What about motors and cooling towers? Consider these and your part-load realities to create real long-term improvements.
The replacement of chillers for hospitals and other health care facilities are often done out of absolute necessity, and it is often avoided for as long as possible.
Much of the energy usage in a commercial building can be attributed to systems that are operating under the assumption that the building is “occupied.”
At some point in time, most college or university building committees are given the responsibility to establish a building upgrade program to enhance their campus and attract the interest of potential future students.
Located in the South End of Boston, Boston Medical Center (BMC) is composed of over 2.5 million sq ft of inpatient, ambulatory care, and medical office space.
Control recommissioning in existing buildings presents an excellent opportunity to not only save energy, but to fix operational deficiencies and work with the building’s occupants to reduce complaints.