The commissioning professional should facilitate at least one design phase meeting with representatives of the O&M trainees, preferably including some future trainees themselves.
All outside air isn’t created equal, neither is the available engineering guidance, and there isn’t enough preliminary owner/consultant discussion about the pros and cons. Welcome to the air filtration design process.
Most of us in the developed world spend the majority of our time indoors, breathing clean-smelling air that is mechanically warmed or cooled and then perhaps filtered and recirculated.
Last month, I opened a discussion on how I have enjoyed integrated project delivery (IPD) and design-build (D-B) projects over the years and how I have been fortunate to learn from other team members as I shaped my “full team participation” (FTP) process.