The plan puts greater emphasis on research to drive thought leadership and proactive advocacy to assist policymakers and the industry to develop innovative solutions to these challenges.
Eliminating oil from the chiller improves performance and reduces maintenance, providing up to $3,650 in annual maintenance costs associated with maintaining the complex oil management system.
Ford is in the midst of a massive renovation and upgrade project at its Dearborn, Michigan, campus. The 10-year transformation initiative targets a reduction in annual energy consumption by up to 50%.
One of the most valuable deliverables from a design and construction project are the as-built drawings (often referred to interchangeably as record drawings).