Model ECV-PM, the latest addition to Greenheck’s ECV line, features an AHRI 1060-certified polymer membrane energy recovery core manufactured from corrugated aluminum sheets used to separate the polymer membrane layers.
How long does it take for condensation to form on an active chilled beam? A group of engineers at SmithGroup used testing and analysis to answer that question and more.
Chilled beams offer building owners greater energy efficiency, reduced building first cost, reduced day-two maintenance, and improved indoor air quality.
MELIPC is designed to enable Internet of Things (IoT) on factory floors that have not been introduced to it yet, or improve it where it is already enabled.
Ahuja, managing director of Ras Al Khaimah, United Arab Emirates-based Maico Gulf LLC, assumed the position during AMCA’s Annual Meeting, Oct. 2-6 in Maui, Hawaii.