Automated Control Systems, Inc. recently completed a $2.7 million BAS integration as part of the renovation and expansion of Monroe Hall on the campus of Loyola University in New Orleans.
Unfortunately, the potential threats to building occupants are varied and increasing. To adapt properly, let’s look at the culture change needed in the design process. Commissioning, recommissioning, and preventive maintenance are further pieces of a strategy to assure ongoing safety.
Will my smoke control system work properly during a fire? That is the question all building owners/operators should ask themselves. Smoke control systems are unique in that they often sit dormant (sometimes for years) and problems that can affect their operation may not be identified until it is too late. To ensure the right answer when you need it, catch up on device monitoring, commissioning, and why the self-test concept has received a bad rap.
Many methods await when it comes to reducing exhaust rates. Fortunately, engineers can avail themselves of multiple tactics, from the hood specification to proper commissioning and air balance.
The assortment of standards, variety of technologies, and evolving weather patterns don’t make it simple. However, humidification and dehumidification strategies that suit the facility’s location and address some spaces’ specialized demands are worth the effort.
The codes and standards aren’t what they used to be when it comes to ventilation requirements. It might also be time to reconsider real-life occupancies with regard to design demands. Is there room to tighten up and boost efficiencies while maintaining adequate airflows?