One hundred VAV controllers are tied to a series of sensors and AHUs to maintain the collection of priceless artifacts at the Abraham Lincoln Presidential Library in Springfield, IL.Looking back,
The Nordic Ski Jump at the 2010 Winter Olympics in Whistler, British Columbia, uses a glycol-based heat transfer fluid to keep the ramp surface frozen for competition.In February 2010, the
A BAS was installed on the St. Vincent Health System campus in Arkansas, saving an estimated $1 million and improving O&M.Established in 1888 in Little Rock, AR under the name
Emory University Midtown Hospital in Atlanta saved money by changing filters based on performance instead of a calendar date.Like many other health care providers, Atlanta-based Emory Healthcare is keenly aware
Polypropylene was used at this Florida retirement community to repair the piping system and save 10% to 15% in first cost.Water challenges, chemical interactions, and other factors led an Orlando
New boilers reduced this Connecticut manufacturing facility’s energy costs.In 2007, after nearly ten years in service, countless repairs, deteriorating efficiency, and four consecutive increases in annual natural gas consumption, OFS
Computational fluid dynamics were used to design a chilled beam system for the Genomic Science Building on the University of North Carolina campus. The installation is expected to deliver a
A geothermal system installed at the Muskogee Community Hospital in Muskogee, OK will save the hospital approximately $144,000 in heating, cooling, and maintenance costs, the hospital predicts.Muskogee Community Hospital in
A chilled beam installation at the Charles H. Townes Center for Science at Furman University in South Carolina is forecast to save the university 31% in energy costs, which equals
Pacific University used 25% less gas and electricity by installing a zone-controlled heating and cooling system in one of its student housing buildings.In the desert city of Las Vegas, there