After settling down at home to watch the 11 p.m. news, mechanical engineer David Andiorio was horrified to see live coverage of a fire at the Camp Hill, PA-based YMCA
The timing couldn't have been better. Wisconsin Central, a regional railroad located in Fond du Lac, WI, needed help in 1995 with its hvac system. Wisconsin Central received a direct
Penn State University opened its newest sports facility in the summer of 1999. The new Indoor Track Facility replaces an outdated facility which was demolished to make room for the
People in the Paulding County Courthouse (Dallas, GA) were feeling like prisoners of IAQ assault and battery, thanks to extremely poorly positioned air intakes. A series of design and equipment
A potent combination of thermal storage, a three-pronged chiller approach, and unique "trigeneration" technology contributes to the comfort of countless groups - engineers and otherwise - convening each year at
Aside from baseball's Twins and the Twin Cities, Minnesota also has a twin-tower government complex in Minneapolis. A unique feature - and air-handling challenge - is its 150-ft, 24-story atrium.With
The philosophy behind creating an Office of Energy Management helped California State University (Northridge) make the transition from $350 million in damage to $700,000 in annual savings.After the 1994 earthquake
St. Augustine's College in Raleigh, NC, signed a five-year Performance Contract with Johnson Controls to implement a much-needed retrofit and bring the college into the 21st century.Founded in 1867 to
At the William S. Moorhead Federal Building in Pittsburgh, two original 990-ton chillers were replaced with two 600-ton, high-efficiency centrifugal machines plus ice storage. "The project started out as an
Oak Point's return air runs are hidden next to vertical supports with takeoffs under benches. A combination dehumidifier/boiler saved the city of Plano, TX, money and space.The new 85,000-sq-ft Oak