L'Anse is a community of 4,500 located in the west-central portion of Michigan's Upper Peninsula. In 1998, voters passed a bond referendum for $9,855,000 for the purpose of building a
Electric utility and maintenance costs at the Region of Waterloo (ONT, Canada) Water Testing Laboratory had become more than the budget could bear, according to Brian Bechtel, coordinator of energy
The University of Maryland Baltimore County (UMBC) is a well-respected institution with a combined student population of 15,000 - midsized in comparison to larger universities. But the Carnegie Foundation ranks
When Lorain County (OH) Metro Parks embarked on building a new aquatic facility, it was at a terrible disadvantage because of a limited budget. At a time when most large
Purdue University's new aquatic center was designed using a dual return-air system consisting of underdeck duct that returns 25% of the air at the pool deck level where chloramines concentration
In order to meet the HVAC needs for the new, 79,604-sq-ft facility Fire Technology Training Center on the Northwest Campus of Fort Worth's Tarrant County College in Texas, computer-generated load
What kind of A/C do you install in a 78-year-old building that has no useable roof space, no dedicated mechanical room, and limited choices for retrofit? Freedom Tower restoration project
When the Time & Life Building opened its doors in 1959, steam-turbine-drive chillers provided cooling for the 48-story building at 1271 Avenue of the Americas. An electricity-driven chiller was added
At this Denver office building, the building owner wasn't ready to replace both of his outdated multizone units, so the failed unit was replaced and the other unit was refurbished.
For years, Los Alamos National Laboratories had searched for a solution to the buildup of silica in its chiller, but newer chiller condensers using a brush system have never required