With the help of advances in intelligent controls and a shift in design mindset, these systems can steer buildings toward smaller equipment sizes and associated savings. Review three projects and consider the benefits of keeping an upcoming project in the loop.
Located in this city’s famous Loop commercial center, the 600-foot-tall Chicago Board of Trade Building (CBOT) houses the world’s oldest futures and options exchange. Until recently, the building also housed a pair of aging built-up systems that were beginning to worry management.
Last September, on what would normally have been a mild autumn day, Southern California was blasted by a record-breaking heat wave with temperatures spiraling upwards to 116°F in the Los Angeles basin. The heat was far above the normal highs, which would typically be in the mid-70s.
In this overview of building information modeling, the authors review how BIM helped in three different projects, often with particular usage- and efficiency-based HVAC demands. While BIM’s space management skills can reduce costly changeorders and building design “clashes” ahead of time, in at least one instance, using BIM actually influenced the HVAC strategy for the better, too. See how HGA Architects and Engineers has used this to become a “model” firm.
Innovation has thrived in Philadelphia since Ben Franklin invented bifocals, the lightning rod, and the wood stove that bears his name more than two centuries ago. This tradition of innovation
Using a CO2 cooling system reduced this organic grocery store’s refrigerant use by 60% to 65% a year. Arizona-based Sprouts Farmers Market is not only a leader in natural and
Regulatory, competitive, and environmental
pressures are pushing data centers away from the traditional power sources.
Here, the author surveys the landscape and reviews one comparative study
involving CCP cogeneration and conventional electricity sources. Reducing the
carbon footprint and lessening reliance on a sometimes unreliable grid are just
two reasons to look into CCP.
Two energy recovery units saved this Air Force Base hangar $24,500 in heat recovery costs. United States Air Force personnel sought a solution to renovate the makeup air and exhaust
Forget high-tech or
high-expense fixes for a minute. Have you tried to bump efficiency by looking
for the next aisle over, deploying a
Trim and Respond strategy, or trying the soon-to-be-famous Paper On A Stick approach?
Some of the biggest names in the data center universe think that you plant the
seeds of real savings with some mighty simple steps.
Here, our long-time forward-thinking columnist uses a common hospital scenario to walk you through the shift from Design-Bid-Build to an Integrated Project Delivery approach. See how the job can get done with similar personnel on a considerably shorter schedule, resulting in a greater team investment in the project’s success and yet more time to get on to other work.