We got some great news just before shipping this issue to the printer. Stephanie Taylor, MD, who is writing a year-long IAQ column for us, has been invited to be a Fellow in the Royal Society for Public Health.
Generally, when we think about BAS or system integration projects, they are for larger projects such as schools, office buildings, and hospitals that are 50,000 sq ft or larger.
Langendorf Supply Co., a distributor and supplier of HVAC equipment throughout the Midwest, decided it was time to investigate how to make its own space more energy-efficient.
This month, I am continuing my recent exploration of situations where building systems do not pass their commissioning functional performance tests at the end of construction.
Over time, many if not all employees eventually become comfortable in their work environment. I don’t think this can be helped, be-cause with routine comes contentment.
Reactors for AC drives are available as either AC reactors or DC reactors (DC link chokes). Both serve the same main purpose: to smooth the current flow to the AC drive, and reduce damaging harmonics produced on the power line.
125 South Wacker, a 31-story Chicago high-rise that is halfway through a five-year master plan, represents a massive undertaking both in volume and scope of equip-ment.
Last month’s column (February 2015) addressed the potential situation where the design engineers specify a change to a system which has already passed its commissioning functional performance test.