In 2016, Georgia Institute of Technology received permission from the state of Georgia to enter into a guaranteed $7.7 million energy savings performance contract (GESPC) to tackle any energy and water conservation project it wanted — as long as the project could pay for itself within seven years.
This month’s Facility File focuses on the March Back2Basics retrofit of a campus-wide hot water boiler system covering 40 buildings with primary-, secondary-, and tertiary-pumping based on a performance lease agreement to retro-commission the system with a guaranteed operating savings. The university will hire an owner representative to work with a design-build-operate-maintain performance contractor (PC).
Today’s school facility directors are being asked to do more with less. With limited budgets, they are pressured to reduce operating expenses while maintaining healthy and comfortable learning environments for students.
The Lebanon Special School District (LSSD) in Lebanon, Tennessee, is one of the nation’s first school districts to retrofit conventional two-pipe classroom unit ventilators with combination VRF and ERV drop-in replacements.
HVAC and trade educators know the importance of students learning and working on equipment they will encounter in the field. This exact focus on experiential learning informed the plans for an expansive new trades teaching facility at Sheridan College’s Brampton, Ontario, Canada, campus.
This month’s Facility File will focus on a new central, high-efficient, hot water boiler plant to replace an antiquated remote high-pressure steam boiler plant serving a campus setting.