Good IAQ management has become paramount in the construction industry, as study after study shows that employee productivity and health are directly related to the quality of air being delivered inside the workplace environment.
A few months ago, this column covered the basics of developing effective control system sequences. You might recall that it discussed the process of how a designer needs to select and describe sequences that provided safe, reliable, and efficient control.
Integrated Project Delivery (IPD) is a collaborative process that has been applied more and more frequently to building design and construction projects. Although it is implemented in slightly different ways from project to project, it is always about involving all project team members in intense planning and coordination, starting very early in design and extending through construction and facility turnover.
More specifically, has natural gas been overlooked? Let’s take a look at some previous habits and code language, current needs, and the advantages that a CHP system can provide for those exceedingly regulated of all environments: hospitals.
Spot exhaust is a unique design engineering challenge. The 2015 ASHRAE Handbook – HVAC Applicationscovers a broad spectrum of applications in just about all the comfort applications (chapters 1 through 13) and industrial applications (chapters 14 through 33) with personal safety an integral part of chapter 32. But spot return air doesn’t get much press in ASHRAE.
There is a fair amount of press about the concept of the “Internet of Things” — or as it is commonly abbreviated, IOT. The concept of IOT is simply defined as a network of physical devices.
Continuing last month’s topic of commissioning action lists (a.k.a. master issues logs, a.k.a. corrective action lists), I would like to focus on the items in those documents that deal with construction phase or acceptance testing “deficiencies.”
Glean the wisdom in an assortment of key process and specification considerations by looking at design through the lens of one university’s Special Collections & Archives project.
Whether one calls it a commissioning action list, a master issues log, a deficiency list, a corrective action list, etc., every commissioning project includes a matrix of items needing attention by someone on the project team. This table is the responsibility of the commissioning professional to create, maintain, and share with the team.