This Rhode Island center of higher learning challenged an initial
benchmark and forged a vision of better energy management through an
upgraded campus-wide BAS. A design-bid approach, a five-point
scorecard for grading bids, and a full-time monitor for the new setup
were just three example of how process can drive performance in
educational and commercial settings alike.
You’redesigning a data center. Which certification makes the most sense? Do
you really know how ASHRAE 90.1 does (or doesn’t apply) to your
project? Where have the mission critical bigwigs put their focus?
Develop perfect pitch for the differences involved and see why the
author prefers to play in the key of ENERGY STAR.
Maybe
the problem was born in design - overestimating pump head, or a
cooling tower that isn’t towering enough. Or it arose in
installation - say, misconnected coils. Even then, a fix may create
a new water mystery. Get in step with some successful detecting
habits to correct the next troubled system you see.
Glad you asked. It involves less ductwork, simpler duct runs, easier system expansion, less demolition if switching from constant volume to VAV, a maneuver for handling solar load shift, and more. For when to use it, why to use it, and how to design it, read on.
Using nearby water for cooling in industrial applications and then returning that water to the source is a traditional maneuver, but it can also damage local aquatic life and violate EPA regulations. Learn the costs and benefits of a few cooling towers configurations, along with tips for dealing with blowdown and effluent within the facility itself. By Joanna R. Turpin
The weather was cold and miserable on the Milwaukee Brewers' opening day, April 6, 2001. However, 42,400 fans easily forgot about that while sitting in comfort beneath the roof of