As I read the press release, something about the DOE’s planned user test bed facility at Lawrence Berkeley National Lab reminded me of the old Wendy’s commercial from the ’80s that most of you are, uh, mature enough to recall.
With the help of advances in intelligent controls and a shift in design mindset, these systems can steer buildings toward smaller equipment sizes and associated savings. Review three projects and consider the benefits of keeping an upcoming project in the loop.
In this overview of building information modeling, the authors review how BIM helped in three different projects, often with particular usage- and efficiency-based HVAC demands. While BIM’s space management skills can reduce costly changeorders and building design “clashes” ahead of time, in at least one instance, using BIM actually influenced the HVAC strategy for the better, too. See how HGA Architects and Engineers has used this to become a “model” firm.
Here, our long-time forward-thinking columnist uses a common hospital scenario to walk you through the shift from Design-Bid-Build to an Integrated Project Delivery approach. See how the job can get done with similar personnel on a considerably shorter schedule, resulting in a greater team investment in the project’s success and yet more time to get on to other work.
Some thermal storage media are familiar to most
of us, but what about gravel? Or lake water? See how those can work in the
right environments, and tuck this away as a general refresher on thermal
storage concepts and options for use in hospitals, data centers, and elsewhere.
Incorporating a plenum can have its design advantages, but corridors serving adjoining areas of health care occupancies are prohibited from being used for a portion of an air supply, air return, or exhaust air plenum. This article and its illustrations can strengthen your grasp of the related NFPA code details and exceptions so you can design and ventilate properly for this special population.