Most of us think of data centers when we think “mission critical,” but
the category goes into financial and health sectors as well. These
five phases of commissioning can provide some additional peace of
mind about performance, no matter which type of critical mission is
at stake.
VFDs and a new chiller reduced this Texas hospital’s carbon footprint. With large central utility plants, over-taxed HVAC systems, and ever-increasing utility costs, many hospitals face the dual problems of
In
recent “Tomorrow’s Environment” columns, I’ve talked about
the need for engineers to change from being a commodity and a
follower to recommitting their technical skills to engineer-driven
consulting services. I touched on some of the engineering initiatives
that are ideally suited for engineer-led teams. The heart of being a
leader of projects begins with three essential attributes: Positive
attitude, creativity, and a high energy level, followed by a need to
lead.
Ave Maria University, located in southwest Florida, opened its doors to students on August 27, 2007. As the first new Catholic university built in the United States in more than
School districts have known for quite some time that temporary equipment can assist in passing the tests of renovations or the pop quizzes of unexpected equipment failure. The lesser-known lesson is that having the plan in place can save significant time and money on top of the equipment’s basic benefits.