When I first started in the HVAC industry working in a design consulting engineering firm, I came to accept that the HVAC sequence of operation and its associated contract specification, Automatic Temperature Controls (ATC), were provided by an ATC sales engineer.
The commissioning professional should facilitate at least one design phase meeting with representatives of the O&M trainees, preferably including some future trainees themselves.
So, you want to generate your own power, for emergencies and/or for everyday use. For the sake of your design/budget/schedule, learn what the utility might expect from you — and what you should expect from it.
The codes, personnel, and terms related to the commissioning process for health care may seem to leave room for confusion. The authors delineate the differences for you here because, especially when it comes to these settings, no such room exists.
This month’s B2B will focus on the B2B July test for HVAC applications of an existing emergency space renovation and is based on chapter 8 (Health Care Facilities) in the 2015 ASHRAE Handbook — HVAC Applications, It is focused on the temporary HEPA filter systems installed within the construction space to maintain a negative pressure in this space.
Increases in energy costs are leading many building owners and facility managers to look for more cost-effective ways to heat and cool their buildings.
Last month, I opened a discussion on how I have enjoyed integrated project delivery (IPD) and design-build (D-B) projects over the years and how I have been fortunate to learn from other team members as I shaped my “full team participation” (FTP) process.