If someone is special enough to spend millions of dollars to have a building custom-designed and constructed for their use, it is un-derstandable that they would expect perfection.
This past August, I wrote in this column about the opportunity to invest in a niche business providing temporary HVAC design and construction administration.
Most people in the major design and construction business understand that commissioning is a process by which a building’s systems are verified to function properly prior to acceptance by the owner.
Clarify the difference between pressure dependent and pressure independent systems, and then make a deep dive into this TAB process. There’s a lot of science involved, but in the end, steering and tweaking the process may seem more like an art.
Tap into engineering and business experience to capitalize on opportunities in the realms of utility incentives, tax incentives, energy usage, and energy demand.
In our world of growing concerns with global warming, utility companies across the world are making energy storage more cost effective for energy users.
As the saying goes, the journey of a thousand miles begins with one step. On a data center project, some tailored software can often point things in the right direction. Novices and grizzled veterans alike would be wise to peruse some of these options for maximizing their new construction and retrofit results.
Commissioning professionals, myself included, have always advocated the delay of systems acceptance by and turnover to the owner until the commissioning process is complete. In this sense, “complete” means the systems pass their functional performance tests and the owner’s operations staff has been properly trained.
There is a great line in the classic 1980’s movie Top Gun, where Maverick says to his co-pilot, Goose, “I feel the need,” and they then say in unison “the need for speed.”
Probably a year before 9/11, I was asked my thoughts along the lines of, “What else should we commission beyond the standard building systems?” My client was the project engineer at the Department of Defense in the Pentagon. I suggested “commission project record drawings.” I guess you could say I made up the task of commissioning record drawings, but I got my point across.