School, warehouse, office building … the boiler stories they tell put the focus back on specific circumstances and smart pre-design study to ensure their systems (and budgets) enjoy the best of times for as long as possible.
Unfortunately, the potential threats to building occupants are varied and increasing. To adapt properly, let’s look at the culture change needed in the design process. Commissioning, recommissioning, and preventive maintenance are further pieces of a strategy to assure ongoing safety.
Designed with the needs of building owners and their specifying engineers in mind, Cambridge Engineering has introduced a new line of Blow-Thru® Direct Gas-Fired Space Heaters to heat smaller commercial and industrial facilities.