The plan puts greater emphasis on research to drive thought leadership and proactive advocacy to assist policymakers and the industry to develop innovative solutions to these challenges.
One of the most valuable deliverables from a design and construction project are the as-built drawings (often referred to interchangeably as record drawings).
Is net-zero feasible? How will the HFC phaseout impact engineering firms? Herb Woerpel, editor-in-chief of Engineered Systems, gained some answers from the attendees of Daikin's recent Group Sales Meeting.
The 65-foot-tall, 134,000-square-foot laboratory consists of 10 testing chambers, allowing AAON to meet and maintain Air-Conditioning Heating and Refrigeration Institute (AHRI) and U.S. Department of Energy (DOE) certifications.
Schober is a licensed P.E. in the state of New York and has more than 33 years of experience in the field of engineering, construction, and project management working extensively with municipal agencies in New York.
This is my third column presenting a real-life example of how trend analysis, if done thoughtfully, can uncover wasted energy even when the system appears to be functioning well.
In my August 2019 article, I began to unpack three approaches that can be utilized to create reoccurring lines of revenue within your engineering and consulting business. This month we will begin to look at the second approach: continuous commissioning.