Continuing with the theme from last month, this column presents another real-life example of how trend analysis, if done thoughtfully, can uncover wasted energy that no one even suspected.
Measuring and verifying both the energy input and the system’s output is essential for data-based optimization, which delivers the biggest savings because varying the energy input of any piece of equipment will vary the total system output.
There are some building types and/or organizations that are nearly always undergoing some sort of facility upgrade, modification, and/or expansion to accommodate evolving needs.
The idea for this month’s topic was hatched during a retro-commissioning project, but it offers lessons to be applied to new construction commissioning.
Much has been written about systems’ readiness for functional performance testing at the end of construction, and pre-functional checklists have become common elements of the commissioning process.